
Night works in the Beneluxtunnel. A4 completely closed on 8-9 December
During the night of 8–9 December 2025, drivers will face major disruptions on the A4 route in the Rotterdam area. Rijkswaterstaat has announced a complete closure of the Beneluxtunnel in both directions, as well as of exit no. 16 Vlaardingen-Oost.
The restriction will be in force from Monday, 8 December, at 21:30 until Tuesday, 9 December, at 5:00. The night-time closure is being introduced due to scheduled maintenance works. Authorities note that entries and exits may be closed earlier to prepare the tunnel for technical operations.
➡️ Transit traffic will be redirected to the Rotterdam Ring, which will increase travel time, especially for heavy goods vehicles. For cyclists and scooter users, a free shuttle service will be provided through one of the tunnel tubes. In the event of incidents, emergency services will have access to tube C.
Latest Posts
From 2026, trucks over 7.5 t will no longer be allowed on Route 42. Hungary redirects traffic to the M4
Hungary is introducing a ban on trucks over 7.5 tonnes on National Road 42. Transit traffic will be diverted to the M4 motorway.Starting in 2026, vehicles...
Netherlands: Road Disruptions from 12 to 15 December
From Friday, 12 December, to Monday, 15 December, truck drivers in the Netherlands should expect significant disruptions on two major motorway sections: A10...
Netherlands: Road Disruptions from 12 to 15 December
Mont Blanc Tunnel Reopens to Heavy Goods Vehicles. Key Works Completed
The Mont Blanc Tunnel is scheduled to reopen to traffic on Friday, 12 December 2025 at 5:00 p.m., according to TMB-GEIE, the operator responsible for...